HUAWEI RNC 6900 PDF

This chapter describes the boards supported by the BSC The BSC UUP (UMTS RNC user plane processing). -. -. 2 GE. 2 GE. Home/Groups/Wireless Network Info Community. BSC e BSC RNC in Pool. Armetta Diamond (1) 4 years 6 months ago View: Reply: 0. Comment. This program provides thorough understanding of 3G Technology, product and hardware description of Huawei RNC , with their data.

Author: Zuramar Malajinn
Country: Mali
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 4 June 2009
Pages: 432
PDF File Size: 19.17 Mb
ePub File Size: 4.90 Mb
ISBN: 985-8-90813-288-3
Downloads: 11545
Price: Free* [*Free Regsitration Required]
Uploader: Dolmaran

Skip to main content. Log In Sign Up. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co. 69900 other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer.

All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided “AS IS” without warranties, guarantees or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute the warranty of any kind, express or implied.

It aims to ensure that the Huawej can work properly by performing verification tasks related to huaei, BSC board software and data file loading, interfaces, and services. This document provides guidelines for commissioning the BSC It includes the following contents: Product Version Enc following table lists the product version related to this document. The software installation package, license, and MML command scripts required for commissioning must be ready.

Remote huaaei is performed by the remote engineer technical owner of the BSC and multiple BSCs can be commissioned simultaneously in the central equipment room.

There is also another commissioning mode: The basic services consist of speech service and data service. Conventions Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol Description Indicates a hazard with a high level of risk, which if not avoided, will result in death or serious injury. Indicates a hazard with a medium or huaawei level of risk, which if not avoided, could result in minor or moderate injury.

Indicates a potentially hazardous situation, which if not avoided, could result in equipment damage, data loss, performance degradation, or unexpected results. Indicates a tip that may help you solve a problem or save time.

  LEY 8204 COSTA RICA PDF

Provides additional information to emphasize or supplement important points of the main text.

General Conventions The general conventions that may be found in this document are defined as follows. Boldface Names of files, directories, folders, and users are in boldface. For example, log in as user root.

BSC6900 e BSC6910 RNC in Pool

Italic Book titles are in italics. Courier New Examples of information displayed on the screen are in Courier New. Convention Description Boldface The keywords of a command line are in boldface. Italic Command arguments are in italics. One item is selected. One item is selected or no item is selected. A minimum of one item or a maximum of all items can be selected. Several items or no item can be selected.

Convention Description Boldface Buttons, menus, parameters, tabs, window, and dialog titles are in boldface. For example, click OK. Keyboard Operations The keyboard operations that may be found in this document are defined as follows. Format Description Key Press the key. For example, press Enter and press Tab. Key 1, Key 2 Press the keys in turn.

BSC6900 Boards and its funtion

For example, pressing Alt, A means the two keys should be pressed in turn. Action Description Click Select and release the primary huwwei button without moving the pointer. 69000 Press the primary mouse huwaei twice continuously 69000 quickly without moving the pointer. Drag Press and hold the primary mouse button and move the pointer to a certain position.

Compared with issue 05this issue does not include any new topics. Compared with issue 05this issue incorporates the following changes: Compared with issue 05this issue excludes the following topics: Compared with issue 04this issue does not include any new topics. Compared with issue 04this issue does not exclude any topics. Compared with issue 03this issue does not include any new topics.

Compared with issue 03this issue incorporates the following changes: Compared with issue 03this issue does not exclude any topics. Compared with issue 02this issue includes the following new topics: Content Description 3 Commissioning Process The figure of commissioning process is optimized. Compared with issue 02this issue does not exclude any topics. Compared with issue 01this issue includes the following new topics: Compared with issue 01this issue does not exclude any topics.

Compared with issue 04 of VRC00, this issue hjawei not include any new topics. Compared with issue 04 of VRC00, this issue incorporates the following changes: Compared with issue 04 of VRC00, this issue does not exclude any topics.

Requirements for Equipment Status Before commissioning, ensure that the equipment meets the conditions listed in Table Table Requirements for equipment status before commissioning Item Requirement BSC hardware The hardware is installed and passes the hardware installation inspection and power-on check.

OMU Configured before delivery. Requirements for Commissioning the Network To ensure smooth verification of the Abis, Ater, A, and Gb interfaces, the network equipment in the commissioning network must meet the following requirements: The BTS should have passed the commissioning and can provide basic functions. The CN equipment should have passed the commissioning and can provide basic functions.

  JEDANAEST MINUTA PAULO KOELJO PDF

Figure shows a typical commissioning network. The quantity and type of cables are not specified. Other commissioning scenarios may be possible, as described in Table Figure shows the commissioning process. Prerequisite The BSC cabinet has passed the power-on check.

BSC e BSC RNC in Pool-Wireless Network Info Community-Huawei Connect

Procedure Step 1 Check whether the cabinet is powered on. The cabinet is not powered on, Go to step Step 2. The cabinet is powered on, Go to step Step 3. Step 2 Power on the cabinet by referring to 66900 On the Cabinet. Step 3 Check the power supply to the cabinet components, as listed in Table Ensure that the hardware operates normally.

In this mode, the site engineer plugs the USB drive hhuawei commissioning into the OMU to complete the installation of the operating system.

The commission is performed through the collaboration between the remote engineer and site engineers. Select a verification method according to the actual scenario. Then, the OMU verification is performed through cooperation of the remote engineer.

The information returned is running, 1. Go to Step 6. The information returned is unused, Go to Step 6. The version of the OMU application is the Perform operations in Step 7 through Step same as that required by the operator, Then this task is complete. The version of the OMU application is 1. Perform operations in Step 7 through Step Perform operations in Step 14 through Step NOTE To view the help huaei of the omutool, run the.

Step 8 Change the external fixed IP address, subnet mask, and the gateway IP address according to the plan of the operator. For example, you can run the following command and then press Enter.

In this case, the commissioning need not necessarily be performed in the BSC equipment room and can be performed in a centralized manner. Step 9 Change the external virtual IP address and the subnet mask of the active and standby OMUs according to the plan.

Ensure that the external virtual IP address is on the same network segment as the external fixed IP address. For example, you hhawei type the following command and then press Enter.

Any IP huaei is in the same l Run rcn. For example, you can run the following command address of the backup OMU. Run the vi reg.